Fulfilment of grid code obligations by large offshore wind farms clusters connected via HVDC corridors

e-Archivo Repository

Show simple item record

dc.contributor.author Attya, A.B.
dc.contributor.author Anaya-Lara, O.
dc.contributor.author Ledesma Larrea, Pablo
dc.contributor.author Svendsen, H.G.
dc.date.accessioned 2017-10-25T11:32:21Z
dc.date.available 2017-10-25T11:32:21Z
dc.date.issued 2016-09
dc.identifier.bibliographicCitation Energy Procedia (13th Deep Sea Offshore Wind R&D Conference, EERA DeepWind'2016). 2016, vol.. 94, Pp. 20-28
dc.identifier.isbn 1876-6102
dc.identifier.uri http://hdl.handle.net/10016/25678
dc.description.abstract The foreseen high penetration levels of wind power will force the systems operators to apply restrictive constraints on wind power plants. The ability of offshore wind clusters, which are connected via HVDC, to fulfill the grid codes, especially those related to voltage stability is investigated. This came in the frame of a project to develop an integrated and practical tool to design offshore wind clusters (EERA-DTOC). The applied case studies examine the system stability during and after severe disturbances, and the compliance with the grid codes. Additionally, this paper explains the applied procedure to utilize the outcomes of Net-OP tool, which proposes an optimized topology to connect the wind power clusters to the interconnected power systems. The integrated simulation environment, namely, PSS/E, is used to implement a highly detailed and dynamic model based on the recommendations of Net-OP tool. The results confirm that wind farm clusters respond to faults and disturbances as desired by the grid codes.
dc.format.extent 9
dc.format.mimetype application/pdf
dc.language.iso eng
dc.publisher Elsevier Ltd.
dc.rights © 2016 The Authors
dc.rights Atribución-NoComercial-SinDerivadas 3.0 España
dc.rights.uri http://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subject.other Wind power
dc.subject.other Grid integration
dc.subject.other Ancillary services
dc.subject.other Voltage stability
dc.subject.other PSS/E
dc.title Fulfilment of grid code obligations by large offshore wind farms clusters connected via HVDC corridors
dc.type article
dc.type conferenceObject
dc.subject.eciencia Energías Renovables
dc.identifier.doi https://doi.org/10.1016/j.egypro.2016.09.183
dc.rights.accessRights openAccess
dc.type.version publishedVersion
dc.relation.eventdate 2016-01-20
dc.relation.eventplace NORUEGA
dc.relation.eventtitle 13th Deep Sea Offshore Wind R&D Conference, EERA DeepWind'2016
dc.relation.eventtype proceeding
dc.identifier.publicationfirstpage 20
dc.identifier.publicationlastpage 28
dc.identifier.publicationtitle Energy Procedia (13th Deep Sea Offshore Wind R&D Conference, EERA DeepWind'2016)
dc.identifier.publicationvolume 94
dc.identifier.uxxi CC/0000027269
 Find Full text

Files in this item

*Click on file's image for preview. (Embargoed files's preview is not supported)


The following license files are associated with this item:

This item appears in the following Collection(s)

Show simple item record