Description:
After a 3 years gap, the 2011 edition of the IPC involved a total of 55 planners,
some of them versions of the same planner, distributed among four tracks: the sequential
satisficing track (27 planners submitted out of 38 registered), the sequential multicore
track (8 planners submitted out of 12 registered), the sequential optimal track (12
planners submitted out of 24 registered) and the temporal satisficing track (8 planners
submitted out of 14 registered). Three more tracks were open to participation: temporal
optimal, preferences satisficing and preferences optimal. Unfortunately the number of submitted planners did not allow these tracks to be finally included in the competition.
A total of 55 people were participating, grouped in 31 teams. Participants came
from Australia, Canada, China, France, Germany, India, Israel, Italy, Spain, UK and
USA.
For the sequential tracks 14 domains, with 20 problems each, were selected, while
the temporal one had 12 domains, also with 20 problems each. Both new and past
domains were included. As in previous competitions, domains and problems were
unknown for participants and all the experimentation was carried out by the organizers.
To run the competition a cluster of eleven 64-bits computers (Intel XEON 2.93 Ghz
Quad core processor) using Linux was set up. Up to 1800 seconds, 6 GB of RAM memory and 750 GB of hard disk were available for each planner to solve a problem. This resulted in 7540 computing hours (about 315 days), plus a high number of hours devoted to preliminary experimentation with new domains, reruns and bugs fixing.
The detailed results of the competition, the software used for automating most
tasks, the source code of all the participating planners and the description of domains and problems can be found at the competition’s web page:
http://www.plg.inf.uc3m.es/ipc2011-deterministic