Publication:
The smaller the market, the better the rent capturing: electrification in North Portugal during the Interwar Period

dc.contributor.authorBartolomé Rodríguez, Isabel
dc.date.accessioned2017-09-05T14:49:15Z
dc.date.available2017-09-05T14:49:15Z
dc.date.issued2012-09
dc.description.abstractThis article analyses the origin of the persistently high level of electricity prices that hampered the expansion of electricity consumption during the interwar period in Porto. Initially, the rent-seeking behaviour of both the supply firm and the City Hall at the local level affected the expansion of the local electricity market. During the 1930s, this collusion at municipal level coincided with unpredictable energy policies at state level. This circumstance impeded the indispensable increase of scale and the building of a regional market of electricity in north Portugal. The literature on regulation and institutional analysis has proved very useful. Finally, though equally important, primary sources from company archives and institutional bodies were also employed.en
dc.description.abstractEste artículo analiza el origen de los elevados precios de la electricidad en Oporto entre las dos guerra mundiales y su secuela, su lenta electrificación. La colusión entre la compañía suministradora y el municipio limitó la expansión al comenzar el servicio hidroeléctrico; luego, la expectativa reiteradamente frustrada de una mayor intervención gubernamental fue en detrimento de mayores inversiones. Se impidió así el necesario aumento de escala, la plena integración del mercado eléctrico del Norte de Portugal y, en consecuencia, los precios eléctricos se mantuvieron elevados y la electrificación sufrió un persistente atraso. La adopción de una perspectiva institucional se ha revelado muy útil para esclarecer el funcionamiento de este mercado, que se ha examinado consultando fuentes empresariales, municipales y gubernamentales.es
dc.description.sponsorshipThis research has been financed by the Fundaçao Ciência e Tecnologia de Portugal.
dc.format.extent34
dc.format.mimetypeapplication/pdf
dc.identifier.bibliographicCitationRevista de Historia Económica / Journal of Iberian and Latin American Economic History (Second Series) / Volume 30 / Issue 02 / September 2012, pp 287-320es
dc.identifier.doihttps://doi.org/10.1017/S0212610912000018
dc.identifier.issn0212-6109
dc.identifier.issn2041-3335 (online)
dc.identifier.publicationfirstpage287
dc.identifier.publicationissue2
dc.identifier.publicationlastpage320
dc.identifier.publicationtitleRevista de Historia Económica / Journal of Iberian and Latin American Economic Historyes
dc.identifier.publicationvolume30
dc.identifier.urihttps://hdl.handle.net/10016/25183
dc.language.isoeng
dc.publisherUniversidad Carlos III de Madrid. Instituto Figuerola de Historia y Ciencias Socialeses
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 España
dc.rights.accessRightsopen access
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subject.ecienciaEconomíaes
dc.subject.ecienciaHistoriaes
dc.subject.jelN44
dc.subject.jelN74
dc.subject.jelN84
dc.subject.jelQ48
dc.subject.jelL94
dc.subject.otherPortugal
dc.subject.otherElectricity ratesen
dc.subject.otherElectricity marketsen
dc.subject.otherUtility regulationen
dc.subject.otherInterwar perioden
dc.subject.otherTarifas eléctricases
dc.subject.otherMercados eléctricoses
dc.subject.otherRegulaciónes
dc.subject.otherPeríodo de entreguerrases
dc.titleThe smaller the market, the better the rent capturing: electrification in North Portugal during the Interwar Perioden
dc.typeresearch article*
dc.type.hasVersionVoR*
dc.type.reviewPeerReviewed
dspace.entity.typePublication
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
RHE-2012-XXX-Bartolome.pdf
Size:
644.29 KB
Format:
Adobe Portable Document Format
Description: